Wed. 31st October 1hr 30min
Clecoed the two HS-903 aft spar halves together with the HS-906 aft spar doubler and match drilled. Clecoed on the eight HS-912 outboard hinge brackets and match drilled.
Calm returned this evening. After the discouraging mess-up yesterday, I had decided to take an evening off but my wife was out at her French class so, as she couldn't benefit from my company, I decided that it would be better to get straight back into the saddle. This piece of work was a good choice as it simply couldn't go wrong. And so it turned out.
The powder coating on the hinge brackets looks great so I don't think I will be painting them. The coating makes getting a 3/32 cleco into the holes somewhat difficult but a 1/8 won't hold them.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment